  • Well Pump 62- Replacing the pump due to failure
  • Well 18- Replacing pump and motor
  • Reservoir Repairs- Repairing the sedimentation and catch basins
  • Chlorine Equipment-¬†Replacing chlorine vacuum heads and smart valve units at Well Fields 2 and 6
  • Pump Station 4- Replace 2 check valves and a meter
  • Well Permit Renewals through SRBC-¬† We have 7 well fields with a total of 23 wells, each well requires a permit through Susquehanna River Basin Commission (SRBC).¬† The permits are valid for 15 years and the renewal process could take up to two (2) years.

Status Update: 

Some of the projects are in motion